Why is Preconstruction Highly Significant to a Successful Building Project?

Why is Preconstruction Highly Significant to a Successful Building Project?

Despite the collaborative efforts by the key players who are involve in the construction industry, most project teams still remain fragmented. As a result, building management teams create a lot of reworks in the construction process.

It can be improved with the use of accurate, real-time project data. Tools such as BIM or building information modelling and cloud-based solutions for preconstruction activities can help a lot for teams to have a connection within the complex web of professionals as they turn design into a fully realised building.

What is preconstruction?

It refers to the work done following the completion of the design and before the building starts. In other words, preconstruction is a way of transforming the vision of the architect into constructable plans to be utilised by contractors and crews.

The phase between the field construction and finished design is quite complex which determines if a project will be successful or not. During this phase, the architect will be the leader, while the engineers will communicate with contractors to design the project based on the needs of the owners.

Thus, it evaluates the design with respect to cost and provides suggestions of alternative methods or procedures to save time and cost.

Why is it important?

Preconstruction is more than just planning and coordination. This is where you win the work and make money. Builders use this to make margins and profits. A lot of construction firms apply the preconstruction process and modified their management methods to support more robust collaboration.

What are the best practices?

One of the best practices that contractors can do is to take necessary steps to make the process of preconstruction more efficient and intelligent. Thus, there should be logistics and material delivery in every jobsite worked out in advance with lots of time for permitting and meeting with local officials.

Here are possible strategies that contractors can use for a more reliable outcome.

• Using BIM software

Leveraging BIM data is arguably the most effective tool for successful planning. This will add a dynamic layer to the outcomes of preconstruction by integrating it to solutions.

The most integrated BIM software will be able to coordinate things like equipment loads, assess the impact of transportation on scheduling, detail requirements and regulations, provides real-time budget information vital to the delivery of the project.

• Prequalifying subcontractors

This will help in mitigating risks during the bidding and hiring processes. Using the right tools and requesting potential design-build trade partners to organise and submit their certifications, financial health, and safety history will make it a lot quicker to find and hire suitable trade partners.

Tools used in preconstruction

Contractors need to use AutoCAD and BIM software together with 3D laser scanning technology to gain accurate information and to save money and minimise the costs when initialising building works.

The use of FARO Scene Cloud software and BIM, for instance, enable the management of secure, cloud-based global project capabilities that each partner can stay informed with Web access to accurate 3D reality data, while tracking projects on a cloud-based program. Leeds Measured Survey uses this trustworthy software as it ensures results.

Why will it help on all occasions and project?

While more firms are prioritising the preconstruction process, it is vital to constantly refine the process. This will ensure that any project can benefit from it on all occasions. The use of essential tools such as FARO Scene, AutoCAD and Revit will continuously monitor 3D Point Cloud, as-built 2D drawings and 3D BIM models.

To ensure that present and future preconstruction is set, it is important that contractors adhere to the following components.

• Move data into the cloud

It is important that every project team must get all information into the cloud. This will provide the right information at the right time and mitigate mistakes happening on the jobsite.

• Create a connected workflow

All information in the cloud such as digital assets and data repositories must be accessible to appropriate teams. This will render design documents, material data, and scheduling, as well as other assets accessible under the same shared system.

• Automate manual processes

Automation is not about eliminating jobs. On the contrary, it can remove unnecessary bottlenecks, free project partners from monotonous tasks, and have the project data streamline the right conversations. This is because workers can become more efficient and productive over time.

Contact Leeds Measured Survey to help you drive your building project to success. We deliver a range of 3D laser scanning services with the utmost care and precision.

CONTACT THE TEAM

Need a measured building survey in Leeds as soon as next day?

Call us now for a competitive quote and let’s get your project off the ground.

    Author: Sonia